Company: Basra Oil Company
Contractor: Al-Baled Al-Mubarak Company
Location: South Iraq, Basra
Duration: 2013-2014
Installation of new 42″ pipeline with BOC From Zubair Depot To Al-Fao (Hammdan Connections for Main Pipelines) scope of work included (ROW, Excavation, Pipes Stringing, Welding, Coating of Pipes joints, Road crossing by the open-cut method and Trust boring, Lowering, Hydrostatic, Backfilling, Cathodic Protection).