Company: Zubair Field Operation Division ZFOD - Eni
Contractor: Aldar International Co.
Field: Zubair Oil Field
Duration: 2018
Scope: Prefabrication, testing, and installation of new suction and discharge CS piping headers, connections of existing pumps inside the pumps room 5m underground level.