Company: Zubair Field Operation Division ZFOD - Eni
Contractor: Aldar International Co.
Field: Zubair Oil Field
Duration: 2016 - 2019
Scope:The scop of work included the fabrication and installation of reinforced concrete valve pit, x single valve pit &x double valve pit, and concrete supports.