Company: Basra Oil Company

Contractor: Pars Kayhan Co.

Field: 24" Gas Pipeline From Basra To Najaf

Duration: 2016 - 2019

Scope: The scope included the installation of reinforcement concrete pit (5x4x3.9 m) for the ESDV on the 24" pipeline from Basra GTU to Najaf PS3 at every 25 km.