Company: Zubair Field Operation Division ZFOD - Eni

Contractor: Aldar International Co.

Field: Zubair Depot, Basra

Duration: 2019

Scope: The scope of work included 1 Qty 36"x24" Split Tee prefabrication, installation, welding, hydrostatic test, assistance the hot tapping team.