Company: Basra Oil Company

Contractor: Pars Kayhan Co.

Field: 24" Gas Pipeline From Basra To Najaf

Duration: 2019 - 2020

Scope:  Erection, Installation, and construction (GTU, PS2, PS3, and the gas pipeline route (ESDV) included.

GUT: 24" Pipeline Tie-ins inside GTU, two hot taps 24"x18", MOV installation, and all support concrete.

PS2 Station: 24" Pipeline Tie-ins inside PS2 and all support concrete.

PS3 Station: 24" Pipeline Tie-ins inside PS3 and all support concrete.

ESDV Station: Each 25 km installation of ESDV with BYPASS line 8" included the excavation, backfilling, Valve pit, and all civil works.