Company: Zubair Field Operation Division ZFOD - Eni

Contractor: Aldar International Co.

Field: Zubair Oil Field

Duration: 2017

Scope: The scope of work included the installation of 24" pipeline 3 km from QA to DGS North, Hot Tapping 24"x16" at the start point QA line, Piping Tie-in inside DGS North.